Case Study: MGC Advanced Polymers

MGC Advanced Polymers, 2009:

Background:

The client had previously purchased un-enclosed blower packages and wanted to attenuate the sound emitting from those units that were already on-site.  There were two units on-site and UBP had already provided the client with an enclosure for the smaller unit.  After UBP provided the smaller unit, MGC requested that we enclose the larger package as well.

Continue reading

Case Study: University of Cincinnati

Cincinnati, 2007:

Background:

The client required a pressurized air system for a research project.  The university team received funding to perform the work and met with UBP to discuss how to obtain a system that would meet their physical and financial needs.

Continue reading

Flow Measurement & Average Demand

Proper equipment design begins with a thorough understanding of your process requirements. All design engineers are concerned with the quality of a particular air delivery solution, but many have not adequately modeled the problem. Sometimes the end result is a quality system that when placed into operation is not at all suited for the real world application.

Case Study: Chesterton, IN Blower Power Consumption Analysis

Universal Blower Pac has been asked to explore the benefit of upgrading the Chesterton, IN Fritz C. Dietrich Environmental Control Facility with high efficiency blower systems. The intent is to reduce power consumption and the corresponding cost to operate the equipment. The current blower system, power consumption, and ongoing operating cost has been evaluated and compared with three different proposed blower systems.

To download the full analysis click here: Case Study: Chesterton, IN